Ziggo Dome LED Facade

Our work on Europe's biggest LED screen, the Ziggo Dome LED Facade.

Our work on the Ziggo Dome LED Facade

In 2024, the Ziggo Dome LED Facade was officially unveiled. The Ziggo Dome has been known for years as an impressive concert venue, both within and outside the Netherlands. The unique 360° LED facade, which envelops the entire building, has become an iconic landmark. Over the past two years, the Ziggo Dome collaborated with KITT Engineering to completely renew the facade. This involved not only replacing the LEDs but also a thorough modernization of the design. In this article, you can read how the project for the Ziggo Dome LED Facade progressed.

The establishment of the Ziggo Dome LED Facade Project

Realizing the iconic LED facade is a project many companies would eagerly want to work on. KITT Engineering was no exception. The Ziggo Dome had been searching for a partner who could replace the LED components of the facade. This turned out to be a perfect challenge for founder and CTO Andries Lohmeijer and his team.

Within a day, KITT’s Research & Development experts not only fully understood the existing technology, but also came up with innovative ideas to elevate the LED facade to the next level. The ability to think along with the client, in this case, the Ziggo Dome, while simultaneously providing creative solutions, was decisive in securing such assignments. As director Fred Koks puts it: “We deliver a variety of standard and common solutions, but the customized application we can offer companies is usually many times larger and more useful.”

Ziggo Dome LED Facade, an overview

Presenting Various Options

To make the Ziggo Dome LED Facade project a success, extensive research was essential. KITT Engineering presented the Ziggo Dome with several options for the new LED facade. This not only considered the technical possibilities but also analyzed practical aspects such as the energy consumption of the LEDs and the optimal viewing angles for the audience.

After a successful Proof of Concept, in which all options were analyzed, KITT gained the confidence to start the project. The Research & Development team then began testing and developing the chosen solution, taking into account crucial factors such as the exact length and routing of the power cables, the maximum voltage capacity of the LED components, and the weather resistance of the facade.

Testing of Ziggo Dome LED Facade hardware
SCMA in the Ziggo Dome LED Facade

KITT Engineering’s Approach on a Large Scale

KITT Engineering’s approach to such projects reflects exactly what the company stands for: the courage to approach situations from a fresh perspective and thus come to unique, practical solutions. KITT Engineering builds a bridge between creative ideas and the final application. This principle always forms the basis of their working method. Or as Andries Lohmeijer aptly describes it: “Innovation is crucial, but it’s not just about technology or clever solutions. It requires the courage to think broader and more versatile.”

The project at the Ziggo Dome involved more than just renewing the LED components. The entire underlying facade also had to be renovated, making it a comprehensive project. KITT Engineering worked closely with other specialized parties to make the project a success.

Developing the technology behind such a project goes beyond simply mounting LEDs on the facade. The control of the LEDs, the ‘intelligence’ behind the spectacular images, was also designed and developed by KITT Engineering. CEO Fred Koks expresses KITT’s expertise as follows: “KITT Engineering has all the knowledge and skills in-house. Combine this with a good dose of creativity, and a successful formula emerges that brings such projects to a successful conclusion.”

The Ziggo Dome LED Facade Project in Practice

Project leader Sjoerd van Hamelen, Field Engineer Nick van Gemert and their team were responsible for the technical realization of the project. Their focus was primarily on controlling the LED strips. They also meticulously measured the capacities of the components. In a project of this scale, minimizing power consumption is of great importance. To achieve this, KITT developed its own Advanced Screen Control & Monitoring System. This innovative system manages and monitors the LED components, ensuring optimal light output and efficient energy consumption.

Thanks to clear communication and the craftsmanship within the team, the project proceeded smoothly and efficiently. An excellent example of this is the renovation of the rear side of the Ziggo Dome, the largest facade of the building. In just nine nights, the old LED components were removed and replaced with new LED strips. This effective approach showcases impressive collaboration and planning.

Delivering high quality, during work hours and after

Since events at the Ziggo Dome continued uninterrupted, it was crucial that the work caused minimal disruption to visitors. The KITT Engineering team ensured that the area around the Ziggo Dome always looked pristine. After each workday, the site was completely cleaned and tidied up because “The Show Must Go On!” For a project of this magnitude, which lasted a total of 1.5 years, a consistent high-quality approach was essential. To achieve this, KITT collaborates with reliable partners such as No Vertical Limit and Street Furniture Montage, with whom they have been working for years.

The end result is something the entire team can be proud of. A revamped, modern 360° LED facade that is both technically and visually impressive. “When you are entrusted with a project like this, it is naturally a significant undertaking. Now that we can see the result after 1.5 years, we are all extremely proud, both of ourselves and of each other,” says Sjoerd van Harmelen.

Research and development in the Ziggo Dome LED Facade project

Within KITT Engineering, engineers Teun Noordkamp and Gijs de Graaf played a key role in the Ziggo Dome project. They were responsible for its technical realisation. Their focus was primarily on checking the control of the LED strips. They were also involved in accurately measuring the capacities of the components.

In a project of this scale, minimising power consumption is of paramount importance. To achieve this, KITT has developed its own Advanced Screen Control & Monitoring System. This innovative system manages and controls the LED components, ensuring optimal light output and efficient energy consumption.

Research and Development by KITT

With this project, KITT Engineering has once again proven its ability to successfully realise complex projects. According to Gijs and Teun, this is thanks to the extensive knowledge and expertise that the company has in-house. This combination of technical innovation and craftsmanship forms the basis for the success of projects of this calibre. “We work with specialized experts in small teams. This allows us to respond quickly, guarantee quality and actively contribute ideas to our customers.”

Customised solutions for every project

Unique projects such as this require customised solutions. That is why KITT Engineering works closely with Smartsteel, a specialist in the construction of large steel structures. The collaboration between these two companies has been a successful formula for many years. Together, they develop impressive LED structures and customised integrations for buildings, shopping centres and other locations.

With our specialization in creative and custom solutions, we realize projects that excel in customization and innovation. The Ziggo Dome project is a perfect example of how KITT knows how to innovate the “Tech Behind Daily Life”.